0860 110 720 info@mkafrica.co.za

Project

Modikwa Mine – South 2
Shaft
– Surface Pipelines and
– Multiple Civils
– Mine Service Water Dams                                                                                                                                                                          – Bulk Earth works

Value: R7 Million
Client Representative:
Dave Louw
Tel : 012 060 0275

Scope:

– Installation of steel pipe lines 250mm dia, 100mm dia for MRW, MSW and potable water
– Installation of sewer line range 110mm dia to 315mm dia PVC and HDPE.
– Construction of Fuel storage facility
– Braitheway tank construction – 408 000 litre reservoir
– Concrete structures 30MPa – 400m³                                                                                                                                                        – Construction of Terraces – 300 000m³